Migration
A pipeline operator needed to move off a legacy OASyS control platform onto a modern AVEVA stack without interrupting continuous operations. The work centered on a phased cutover engineered to keep risk contained at every step.
Pipeline control cannot simply be switched off for a migration, so the cutover had to protect live operations throughout.
Thousands of points had to move without silent drift between the old and new systems.